The work being done today, 2/13/2014, by PNM at the SRR intersection with NM-285 is to install poles and rig electrical lines east to provide electrical power to the newly-built booster station belonging to the Eldorado Area Water and Sanitation District pumping system.
Al
No comments:
Post a Comment