Sunday, June 10, 2012
Spur Ranch Road Dues Collection Notice
Wednesday, June 6, 2012
SRRA Board Meeting 31-May-2012
Jim to send neighborhood announcement reminding about dues. Al Webster to remind Silver Saddle. Kerry Armour to remind RSL. Jim to also remind TCHOA as Ron Billingsley was not in attendance at meeting.
Due to a lack of rain Jim proposed and Al seconded that we vote to do a complete grading, wetting and rolling of the road west of the tracks. Expected expenditure ~$3800. Unanimously carried. Kerry to contact local contractor recommended by Mary Anne Stickler.
Update on bank balance: $11,858.30 31-May-2012 presented by Bob Holzer
Tuesday, June 5, 2012
TIERRA BELLO PROPOSED DEVELOPMENT NEWSLETTER 31, 6-4-2012
Friday, May 11, 2012
SRRA Board Meeting 9-May-2012
Met to discuss upcoming TV filming, annual dues and collection road condition.
Breaking Bad TV show will be filming along the tracks and is offering $3000 to road association. Same boilerplate agreement was offered to all other parties. Al Webster moved and Kerry Armour seconded to. accept offer. unanimously carried. Aditional agreement to consider the $3k a windfall and not have it reduce the overall dues. Board members will be reminding residents to pay agreed upon 2012 dues. Silver Saddle to be asked by AL Webster. RSL by Kerry Armour. Jim Garlans will contact TCHOA and send out a general announcement. If Monsoon appears to damage road and replicate slippery winter conditions, the board has unanimously voted to adopt escalation steps written by Al Webster as follows:
- Immediately contact a reputable and certified road building contractor to get an estimate for gravel and grading
- Following our next rain (and there will be one):
· Telephone Bob Sherwin of Road Packer SW immediately when the problem is noted.· If there is no positive and immediate response to our dilemma:· Have a grader/grader operator in readiness to take the slop off the road following the next precipitation event followed immediately by:· Notifying both Michael McDermott and the chap in Australia (separately and individually so they don’t know we’re talking to both) of the problem.· If no positive and immediate response, notify our attorney that:· Bob has failed to fulfill his contract and we demand both cost and damages (including the cost of the core and the analysis, the cost for man hours expended to assist him in his failed effort to make the road right, etc.) to the tune of whatever the estimate is to fix the road as per the earlier estimate and the damages· Advise the attorney to convey to Bob that SRRA intends to notify the appropriate departments within the State of New Mexico, Santa Fe County and the City of Silver City.· If no positive and immediate response then proceed to court with the sample as evidence.Additional Road Work:
Area west of track with existing basecourse, should be graded and re-barditched. Jim moves to authorize this expenditure, Kerry seconded. All were in favor. Expected expenditure ~$1000 Analysis of water movement indicates that installing a culvert near Calle Junipero does make sense, so should we go ahead. Jim moved that we do the work, Ron seconded, all were in favor. Expected expenditure ~$1500 Hope to do work some time in June/July rain dependent.
Update on Joe Miller's Tierra Bello development... TCHA is resubmitting all their complaints from the previous TB submission. Secret arbitration was had with Miller and County to avoid a suit over this development and new documentation must be submitted on Miller's new proposal. Bill Davis submitted a concern that Miller's previous road construction exacerbated SRR flooding. Keeping Miller's development off SRR is a preeminent concern. Documentation to be forthcoming from TCHA and Jim.
Thursday, May 10, 2012
"Breaking Bad" Notification Letter
Saturday, May 5, 2012
SRRA Board Meeting Announcement
Thursday, April 19, 2012
Spur Ranch Road Update-Thurs_04_19_2012
Dear Neighbor,
The brief rain this afternoon dumped 0.17 inches of water on our road. Immediately after the rain stopped, SRRA director Al Webster and I made “skid tests” along the length of the road (jamming on brakes suddenly to see if the surface was slippery) and generally to check out the impact of the water on traction and drivability. This was the first precipitation we’ve had since the new gravel was distributed across the road and compressed down into the surface, a couple of weeks ago.
Basically, the road seemed to hold up well, except for a few slightly slippery spots at the crest of the hill where the surface looked somewhat bare, with minimal surface gravel. Even those spots were drivable, however, and we observed traffic moving normally.
We could easily see tire tread marks where we drove, but we saw the same thing on the new basecourse road on Silver Saddle, which we checked out for comparison. We also repeated the skid tests on the basecourse part of SRR west of the RR tracks and it seemed about the same as the Roadpacker part
We won't really know for certain how the road holds up until we get a sustained rain. I'd say things look promising at this point, but no definite conclusions yet. I think it's desirable for residents to drive on the road when it's wet, because that pushes the gravel down into the surface. Just be careful near areas which have very little gravel.
Regards,
Jim

